start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
start [2023/04/11 09:31] – [FESMARKET] team3start [2023/06/01 10:19] (current) – [Sponsor] team3
Line 3: Line 3:
 <figure flabel1> <figure flabel1>
 {{:brand.png?400|}} {{:brand.png?400|}}
-<caption>FESMARKET members</caption> 
 </figure> </figure>
 </WRAP> </WRAP>
  
-===== Sponsor ===== +
-//Insert the link to the project sponsor here//+
  
 ===== Project Summary ===== ===== Project Summary =====
Line 14: Line 12:
  
 The project requirements are: The project requirements are:
-  - ... (//specify here your project requirements//);+  - Interactive screen ; 
 +  - Storage area ;  
 +  - Voice assistance ;  
 +  - Payment tool ;  
 +  - Application ;  
 +  - Security system ;  
 +  - Scale ; 
 +  - Innovative and ergonomic design ;  
 +  - Scanner system ; 
 +   - Thermal isolation area ;  
 +   - Sustainable ; 
 +   - Lateral door ; 
   - Comply with the following EU Directives:   - Comply with the following EU Directives:
     - Electromagnetic Compatibility Directive ([[https://ec.europa.eu/growth/sectors/electrical-and-electronic-engineering-industries-eei/electromagnetic-compatibility-emc-directive_en|EMCD]]);      - Electromagnetic Compatibility Directive ([[https://ec.europa.eu/growth/sectors/electrical-and-electronic-engineering-industries-eei/electromagnetic-compatibility-emc-directive_en|EMCD]]); 
  • start.1681201908.txt.gz
  • Last modified: 2023/04/11 09:31
  • by team3