log

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
log [2023/04/26 09:29] – [7th Meeting (2023-04-19)] team3log [2023/06/15 00:15] (current) – [14th Meeting (2023-06-07)] team3
Line 1: Line 1:
 ======Logbook====== ======Logbook======
-//This is your logbook. Insert here all relevant information regarding the evolution of your project// 
 ===== Weekly Report ===== ===== Weekly Report =====
 ==== 1st Week Report ==== ==== 1st Week Report ====
Line 70: Line 69:
   * //22/04/2023: Electronics and components //   * //22/04/2023: Electronics and components //
   * //23/04/2023: APP interface //   * //23/04/2023: APP interface //
- + 
 +==== 11th Week Report ==== 
 +  * //24/04/2023: 3D model video// 
 +  * //25/04/2023: Prototype connections // 
 +  * //26/04/2023: MAgnetic charge //  
 +  * //26/04/2023: APP interface //  
 +  * //27/04/2023: Wiki update // 
 + 
 +==== 12th Week Report ==== 
 +  * //01/05/2023: Detailed drawings// 
 +  * //01/05/2023: Prototype connections // 
 +  * //02/05/2023: Packaging //  
 +  * //03/05/2023: Magnetic charge design //  
 + 
 +==== 14th Week Report ==== 
 +  * //15/05/2023: Cameras (prototype)// 
 +  * //16/05/2023: APP // 
 +  * //18/05/2023: Report changes //  
 +  * //18/05/2023: Paper //  
 ===== Meetings ===== ===== Meetings =====
  
Line 133: Line 151:
 === Agenda: === === Agenda: ===
   - // Report changes //   - // Report changes //
 +  - // Packaging? //
 +  - // 3D model video //
 +
 +
 +==== 9th Meeting (2023-05-04) ====
 +=== Agenda: ===
 +  - // Report changes //
 +  - // Packaging //
 +  - // Diagrams (connections)//
 +
 +==== 10th Meeting (2023-05-18) ====
 +=== Agenda: ===
 +  - // Report changes //
 +  - // Interface //
 +  - // Abstract (PAPER)//
 +
 +==== 11th Meeting (2023-05-25) ====
 +=== Agenda: ===
 +  - // Camera connected to the raspberry pi. Able to scan barcode and open specific link. //
 +  - // Need connectors to connect HX711's to loadcell and raspberry pi. //
 +  - // Updates on the paper. //
 +
 +==== 12th Meeting (2023-06-01) ====
 +=== Agenda: ===
 +  - // Suggestions on how to fixate the loadcell to get accurate measurements. Maybe a drill in wood to put the screws in?. //
 +  - // Tabular in paper too wide, is there an easy solution?. //
 +  - // Prototype tests not fully done yet. What to put in the paper?. //
 +
 +==== 13th Meeting (2023-06-07) ====
 +=== Agenda: ===
 +  - // API is online with google cloud //
 +
 +==== 14th Meeting (2023-06-07) ====
 +=== Agenda: ===
 +  - // Finished tablet application (see video in deliverables) //
 +  - // Questions about the final presentation //
 +
 +
 ===== Activities ===== ===== Activities =====
-//Please register here all accomplished project activities// 
  
-^ Start      ^ End       ^ Task          ^Description ^  Who^ +^ Start     ^ End       ^ Task                                                                                        ^ Description                                                                                                                                             Who ^ 
-| 23/02/23 | 26/02/23  | Choosing the project from the proposal list  | We chose "Smartification of an everyday object" after discussing some topics  | M,DA,H,DO,J, +| 23/02/23  | 26/02/23  | Choosing the project from the proposal list                                                 | We chose "Smartification of an everyday object" after discussing some topics                                                                | M,DA,H,DO,J,  
-| 27/02/23 | 03/03/23  | First ideas from within the selected theme. Smart shopping cart, bus stop and other ideas.  | We opted for the smart shopping cart, as it seemed more interesting, with more potential and more possibilities for development.  | M,DA,H,DO,J,T | +| 27/02/23  | 03/03/23  | First ideas from within the selected theme. Smart shopping cart, bus stop and other ideas.  | We opted for the smart shopping cart, as it seemed more interesting, with more potential and more possibilities for development.            | M,DA,H,DO,J,  
-| 27/02/23 | 03/03/23  | State of the art  |We analyse the market, the technologies surrounding our product: dynamo system, scanners, smart carts...   | M,DA,H,DO,J, +| 27/02/23  | 03/03/23  | State of the art                                                                            | We analyse the market, the technologies surrounding our product: dynamo system, scanners, smart carts...                                    | M,DA,H,DO,J,  
-| 01/03/23 | 02/03/23  | Logo and brand  | Design of the logo, and branding, color decisions.   | M   +| 01/03/23  | 02/03/23  | Logo and brand                                                                              | Design of the logo, and branding, color decisions.                                                                                          | M               
-| 06/03/23 | 10/03/23  | Definition of the backlog and elaboration of the Gantt chart | We organise all the tasks to be carried out from the beginning to the end of the course.    | M,DA,H,DO,J, +| 06/03/23  | 10/03/23  | Definition of the backlog and elaboration of the Gantt chart                                | We organise all the tasks to be carried out from the beginning to the end of the course.                                                    | M,DA,H,DO,J,  
-| 06/03/23 | 10/03/23  | Brainstorming and mindmap  | All the aspects to be dealt with in relation to the cart are defined, and we begin to contribute ideas that seem interesting to all of us.   | M,DA,H,DO,J,T| +| 06/03/23  | 10/03/23  | Brainstorming and mindmap                                                                   | All the aspects to be dealt with in relation to the cart are defined, and we begin to contribute ideas that seem interesting to all of us.  | M,DA,H,DO,J,  
-| 15/03/23 | 16/03/23  | Leaflet | Design of the leaflet | DA,H,DO,J,T | +| 15/03/23  | 16/03/23  | Leaflet                                                                                     | Design of the leaflet                                                                                                                       | DA,H,DO,J,    
-| 10/03/23 | 17/03/23  | System diagrams | Definition and design of the system diagram in relation with our product | H, J | +| 10/03/23  | 17/03/23  | System diagrams                                                                             | Definition and design of the system diagram in relation with our product                                                                    | H, J            
-| 10/03/23 | 17/03/23  | Structural drafts | First sketches and draws of the idea | M   +| 10/03/23  | 17/03/23  | Structural drafts                                                                           | First sketches and draws of the idea                                                                                                        | M               
-| 20/03/23 | 22/03/23  | New drawings | First sketches and draws of the idea | M   +| 20/03/23  | 22/03/23  | New drawings                                                                                | First sketches and draws of the idea                                                                                                        | M               
-| 21/03/23 | 22/03/23  | Material and components | 3 options for each component | M,DA,H,DO,J,  | +| 21/03/23  | 22/03/23  | Material and components                                                                     | 3 options for each component                                                                                                                | M,DA,H,DO,J,  | 
-| 20/03/23 | 22/03/23  | Solar panels and electricity| Study of the electrical consumption and solar panels | T   |  +| 20/03/23  | 22/03/23  | Solar panels and electricity                                                                | Study of the electrical consumption and solar panels                                                                                        | T               
-| 22/03/23 | 24/03/23  | Mesoenvironment analysis| Supermarkets analysis and market | M   |  +| 22/03/23  | 24/03/23  | Mesoenvironment analysis                                                                    | Supermarkets analysis and market                                                                                                            | M               
-| 20/03/23 | 24/03/23  | Final design| Draws and first render of the final design | M   |  +| 20/03/23  | 24/03/23  | Final design                                                                                | Draws and first render of the final design                                                                                                  | M               
-| 20/03/23 | 21/03/23  | Targeting and positioning | User persona, benchmarking and positioning map | M   |  +| 20/03/23  | 21/03/23  | Targeting and positioning                                                                   | User persona, benchmarking and positioning map                                                                                              | M               
-| 22/03/23 | 26/03/23  | Back end | Developement of the code for the app | J   |  +| 22/03/23  | 26/03/23  | Back end                                                                                    | Developement of the code for the app                                                                                                        | J               
-| 24/03/23 | 26/03/23  | System diagram and user story | Software diagrams | J   |  +| 24/03/23  | 26/03/23  | System diagram and user story                                                               | Software diagrams                                                                                                                           | J               
-| 27/03/23 | 31/03/23  | Ethics | Investigation on ethics | DO   |  +| 27/03/23  | 31/03/23  | Ethics                                                                                      | Investigation on ethics                                                                                                                     | DO              
-| 27/03/23 | 31/03/23  | Market analysis | Market size, tendencies, user | M   |  +| 27/03/23  | 31/03/23  | Market analysis                                                                             | Market size, tendencies, user                                                                                                               | M               
-| 25/03/23 | 31/03/23  | Sustainability | Sustanability redaction | DO, T   |  +| 25/03/23  | 31/03/23  | Sustainability                                                                              | Sustanability redaction                                                                                                                     | DO, T           
-| 25/03/23 | 31/03/23  | Electronic components | System diagram | DA   |  +| 25/03/23  | 31/03/23  | Electronic components                                                                       | System diagram                                                                                                                              | DA              
-| 10/04/23 | 14/04/23  | Materials and components | Providers, prices, final components | DA, M   |  +| 10/04/23  | 14/04/23  | Materials and components                                                                    | Providers, prices, final components                                                                                                         | DA, M           
-| 10/04/23 | 16/04/23  | User interaction | Drawings and renders of user interaction with the product | M   +| 10/04/23  | 16/04/23  | User interaction                                                                            | Drawings and renders of user interaction with the product                                                                                   | M               
-| 10/04/23 | 16/04/23  | 3D model final | Redesign | M   |  +| 10/04/23  | 16/04/23  | 3D model final                                                                              | Redesign                                                                                                                                    | M               
-| 12/04/23 | 16/04/23  | Project management | Risk matrix, people, stakeholders management, sprint outcomes... | H, M, DA  +| 12/04/23  | 16/04/23  | Project management                                                                          | Risk matrix, people, stakeholders management, sprint outcomes...                                                                            | H, M, DA        
-| 12/04/23 | 16/04/23  | Presentation and interim report | Create presentation, changes in the wiki | H, M, DA, T, J  |+| 12/04/23  | 16/04/23  | Presentation and interim report                                                             | Create presentation, changes in the wiki                                                                                                    | H, M, DA, T, J  
 +| 17/04/23  | 23/04/23  | Charging station investigation                                                              | Think about the way the smart shopping cart will be charged                                                                                 | DA, H           | 
 +| 17/04/23  | 26/04/23  | 3D model video                                                                              | Creation of 3D model video                                                                                                                  | M               | 
 +| 26/04/23  | 30/04/23  | Detailed drawings                                                                           | Drawings and renders of the components                                                                                                      | M               | 
 +| 01/05/23  | 06/05/23  | Packaging                                                                                   | Explain the transportation, packaging..                                                                                                     | T               | 
 +| 03/05/23  | 06/05/23  | Poster                                                                                      | Poster design                                                                                                                               | M               | 
 +| 15/05/23  | 21/05/23  | API                                                                                         | Back end application                                                                                                                        | J               | 
 +| 15/05/23  | 21/05/23  | Prototype tests                                                                             | Cameras testing, load tests                                                                                                                 | DA, H           | 
 +| 15/05/23  | 21/05/23  | Sustainability modifications                                                                | Add information and be more precise in the explanation                                                                                      | T, DO           | 
 +| 15/05/23  | 21/05/23  | Paper                                                                                       | Advance of overleaf paper                                                                                                                   | M               |
  
  
  
  • log.1682497742.txt.gz
  • Last modified: 2023/04/26 09:29
  • by team3